Julixing Instruments

Julixing Instruments

 
Julixing Instruments

Company News

The maintenance of the lamp cap gauge

1. After using the lamp cap gauge, we should clean up the dirt, then put in lamp cap gauge box.

2. If you don’t use lamp cap gauge for long time, you’d better to take care keep.

3. Djustable thread ring gauge non Nonstoichiometry staff be adjusted to ensure measuring accuracy.

4. Prohibit that the staff adjust the adjustable lamp cap gauge, pls ensure the measuring accuracy.

5. Prohibit screwing into threads, avoid to premature wear.

6. After use with oil and put into the box, that will be not rust for long time.

    Standard:       IEC 61032 IEC 60061 IEC 60335 IEC 60529 IEC 60068 IEC 60695 VDE 0620 UL AS/NZS3112
    TAG:
IEC Test Probe Go No Go Gauge Spring Impact Hammer Integrating Sphere UL Probe Test IP Tester Test Equipment
 
Glow Wire Tester Impact Test Hammer Go Gauge UL Test Finger Probe Hipot Tester Test Probe Needle Impact Testing Machine
  Español   Español Svenska   Svenska لعربية   لعربية русский   русский Português   Português 中国  中国 Polski   Polski Română   Română Dansk   Dansk suomi   suomi
  Français   Français hrvatski   hrvatski Ελληνικά   Ελληνικά Nederlands   Nederlands česky   česky Deutsch   Deutsch 日本の   日本の Italia   Italia български   български นไทย   นไทย
test probe